904L Transmission Line Rebuild
Find your property using our interactive map!
Overall Project Map
![]() |
Download full resolution PDF |
Edmonton Area Map
![]() |
Download full resolution PDF |
Overview
AltaLink is proposing to rebuild approximately 47 kilometres of an existing transmission line, named 904L, between the Jack Fish Lake area and the Petrolia substation located in the City of Edmonton.
Project Details
Length of line: 47 kilometres
Line voltage: 240 kV
Structure type: H-frame 240 kV tower
Right-of-way: 61 metres
Project Schedule
| Summer 2009 | Notify and consult with landowners and residents |
| Winter 2009 | Anticipated filing of application with the Alberta Utilities Commission (AUC) |
| Summer 2010 | Start project construction if approval is granted by AUC |
| Spring 2011 | Complete construction of project |
August/September 2009
Open house display content
Newsletter, Issue 2
June/ July 2009
Open house display content
Stakeholder Letter
Newsletter, Issue 1
Overall area project map, Edmonton area map and Transmission towers detail map