Overview

AltaLink is proposing to rebuild approximately 47 kilometres of an existing transmission line, named 904L, between the Jack Fish Lake area and the Petrolia substation located in the City of Edmonton.

Project Details

Length of line: 47 kilometres
Line voltage: 240 kV
Structure type: H-frame 240 kV tower
Right-of-way: 61 metres

Project Schedule

Summer 2009       Notify and consult with landowners and residents
  Winter 2009       Anticipated filing of application with the Alberta Utilities   
   Commission (AUC)
Summer 2010       Start project construction if approval is granted by AUC
Spring 2011       Complete construction of project

August/September 2009
Open house display content
Newsletter, Issue 2

June/ July 2009
Open house display content
Stakeholder Letter
Newsletter, Issue 1
Overall area project map, Edmonton area map and Transmission towers detail map