Heartland Transmission



The Project: Details

 

The Southwest 240 kV Project consists of the following five major components:

  • Build a new Goose Lake substation near the existing Pincher Creek substation;
  • Expand the Peigan and North Lethbridge substations;
  • Construct a new double-circuit 240 kV transmission line between the new Goose Lake
        substation and the Peigan substation; and
  • Construct a new double-circuit 240 kV transmission line between the Peigan substation
        and the North Lethbridge substation; and
  • Complete associated improvements to the existing 138 kV transmission system,
        accommodating the addition of the proposed 240 kV transmission line. The major
        improvements consist of:
            - Stirling to Tempest substation (new 138 kV transmission line)
            - 725L and 170L 138 kV connection (southwest of Fort Macleod)
            - Fort Macleod 15S substation upgrade
            - Magrath 225S substation upgrade
            - Drywood 415S substation upgrade