Heartland Transmission



The Project

Details | Schedule | Map | Environment

 

The Alberta Electric System Operator has identified that the existing transmission system in the southwest part of our province has insufficient capacity to transmit wind generated electricity to Alberta’s transmission grid. The Southwest 240 kV Project is required to connect the wind generation to the rest of the grid and to enable the continued development of wind energy projects in the southwest region of the province.

The 240 kV development in southwestern Alberta:

  • Provides adequate transmission capacity to connect existing and future wind generation;
  • Allows Albertans to access a clean source of electricity; and
  • Strengthens the electrical transmission system in the southwest region of Alberta.
  • Forecast project cost is $199 million.

 

AltaLink received Permit to Construct and License to Operate (P&L) for this project from the Alberta Utilities Commission on May 11, 2009.

Any financial, schedule or cost information provided herein are estimates only and AltaLink shall not be held liable to/by any person for direct or indirect injury, loss or damage arising out of the use of, or reliance on, this information, in whole or in part. AltaLink makes no express or implied warranty(ies) concerning the suitability of this information for the user’s intended purposes and the entire risk as to the use, and the results of such use, of the information provided by AltaLink, or any part(s) thereof, is assumed by any unauthorized recipient thereof.