Heartland Transmission



240 kV Line Upgrades

New 908L Transmission Line | 904L Transmission Line Rebuild

 

The Alberta Electric System Operator (AESO) has requested AltaLink complete system upgrades in the Edmonton region to:

  • Remove bottlenecks which restrict transmission line capacity;
  • Address the changes in Alberta’s electric grid due to the future retirement of a
        coal-fired electricity generator at Wabamun and the growth of wind generated
        electricity in southern Alberta; and
  • Meet the increasing electrical demand in Edmonton and the northeast region.